Floodplain Development in C-1
Floodplain Development in C-1 Zoning Permit Procedure and Flowchart
A permit is necessary for any permitted uses allowed in the C-1 Conservancy District, including road right-of-ways.
- Application Form (fillable form) ***Please note: The form must be saved to your local desktop BEFORE filling in the application.***
- C-1 Conservancy District Permit Proposal Checklist (fillable form)
- EFD Existing Floodplain Development District Permit (fillable form)
- Land Owner Authorized Agent Form
If you have a non-conforming structure or use, you may need to complete the Non-Conforming Structure Worksheet and/or the Non-Conforming Structure and Use Worksheet. Contact the Planner of the Day for more information.
You may need a Preliminary Site Evaluation for impact on your well and septic system or a Storm Water Permit to prevent sediment from leaving your site.
Mailing Address: 515 W. Moreland Blvd. Room AC 230, Waukesha, WI 53188
Reception Desk: Room AC260
Phone: (262) 548-7790
For general information, please contact the Planner of the Day